Friday, October 14, 2011
United's First Dreamliner Rolls Off Assembly Line
Seattle Post Intelligencer: Wednesday night, Boeing pulled out United Airline’s first 787 Dreamliner from the factory and off the final assembly line. The first 787 Dreamliner has already been delivered to the launch customer, ANA, but United will be the first North American airline to take delivery of the new aircraft. From United’s press release: “While in final assembly, the aircraft moved through four factory positions, including the final aircraft body join, landing gear installation, weight-on-wheels testing and installation of interior components and systems. Over the next several months, the aircraft will move to the next phase of completion, which includes final cabin configuration, installation of engines and painting.”
United will configure their first 787 with 36 seats in BusinessFirst, 63 seats in Economy Plus and 120 seats in Economy. There was some speculation if United might be offering a special livery, but I doubt it. When I was on the factory floor recently, the tail was definitely a solid blue, which matches United’s current “new” livery. With United recently switching their brand over from the tulip to the globe, it wouldn’t really make sense for them to also introduce a special livery. Normally I am all for any livery that spices things up, but at this stage it would just cause brand confusion.
Although the exact date of delivery is unknown, United is hoping to take delivery of their first Dreamliner by the end of 2012 and will be the first of 50 that the airline has on order.
Click here to view high resolution photos.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment